Focus ST 250 Gen3
250 ch · 2015
Motorway range comparison
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
Paris → Marseille · 130 km/h · Caralogy simulation
| Focus ST 250 Gen3 | Megane E-Tech Electric | |
|---|---|---|
| Total time | 7h01−29 min | 7h30 |
| Charging stops | 0 stops−2 stops | 2 stops |
| Total cost | 89,81 € | 42,58 €−47,23 € |
Both vehicles drive at 130 km/h. The difference comes from charging stops.
Analysis
Both vehicles drove at 130 km/h for the entire trip. The Focus ST 250 Gen3 (combustion) makes no stop, the Megane E-Tech Electric (electric) 2 stops totalling 29 min. Road safety reminder: on a trip of this duration, it is recommended to stop for at least 51 min total (17 min every 2h). The energy cost is 89,81 € for Focus ST 250 Gen3 versus 42,58 € for Megane E-Tech Electric.
The official WLTP figures (6,8 L/100km for Focus ST 250 Gen3 and 15,8 kWh/100km for Megane E-Tech Electric) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 5,7 L/100km (Focus ST 250 Gen3) and 13,8 kWh/100km (Megane E-Tech Electric). Full methodology: see the dedicated button above the summary.
On a 200 km round trip (e.g. a weekend getaway), the electric or plug-in hybrid vehicle completes the entire journey on home energy at 0.18 €/kWh - with no charging stop. The time advantage of the combustion car on long-distance motorways disappears entirely, and the economic advantage of electric strengthens considerably.
The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Marseillefuel · 2,03 €/L | 775 km44 L consumed | 0,116 €/km | 89,81 € |
| Trip total | 89,81 € | ||
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Limonest, A6initial energy charged at home · 0,20 €/kWh | 391 km54 kWh consumed | 0,028 €/km | 10,81 € |
| Limonest, A6 → Montélimar, A7energy charged at Ionity 120 kW · 0,60 €/kWh | 174 km24 kWh consumed | 0,083 €/km | 14,40 € |
| Montélimar, A7 → Marseilleenergy charged at Ionity 110 kW · 0,60 €/kWh | 210 km29 kWh consumed | 0,083 €/km | 17,37 € |
| Trip total | 42,58 € | ||
How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
| Charging stop duration | Ford Focus ST 250 Gen3 | Renault Megane E-Tech Electric |
|---|---|---|
| 5 minutes | - | ~55 km |
| 10 minutes | - | ~110 km |
| 20 minutes | - | ~220 km |
| Full session 10 → 80 % | - | ~304 km30 min |
Replace one of the two with an alternative from the same segment
250 ch · 2015
218 ch · 60 kWh · 2024
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the Focus ST 250 Gen3 arrives in 7h01 with 0 charging stop.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 89,81 € (Focus ST 250 Gen3) and 42,58 € (Megane E-Tech Electric). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.