S e-tron GT
670 ch · 105 kWh · 2025
Motorway range comparison
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
Paris → Marseille · 130 km/h · Caralogy simulation
| S e-tron GT | S6 Sportback e-tron | |
|---|---|---|
| Total time | 7h13−20 min | 7h33 |
| Charging stops | 1 stop−1 stop | 2 stops |
| Total cost | 49,45 €−7,11 € | 56,56 € |
Both vehicles drive at 130 km/h. The difference comes from charging stops.
Analysis
Both vehicles drove at 130 km/h for the entire trip. The gap is built at the stops: 1 stop of 12 min for the S e-tron GT versus 2 stops totalling 32 min for the S6 Sportback e-tron.
The official WLTP figures (15,9 kWh/100km for S e-tron GT and 16,5 kWh/100km for S6 Sportback e-tron) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 18,8 kWh/100km (S e-tron GT) and 19,5 kWh/100km (S6 Sportback e-tron). Full methodology: see the dedicated button above the summary.
During the 12 minutes of charging for the S e-tron GT, range recovers by 301 km. During the 32 cumulative minutes for the S6 Sportback e-tron, range recovers by 368 km. Per minute: the S e-tron GT recovers 2,2× faster. At this rate, the charging stop blends into the trip rhythm - just enough time for a coffee. At a lower rate, it dictates the pace.
A BMW 530i (equivalent segment) consumes about 8,0 L/100km on the motorway at 130 km/h. At 1,9 €/L, this Paris → Marseille trip would cost ~115 €. That is 2,3× the electric cost of the S e-tron GT and 2,0× that of the S6 Sportback e-tron. The gap narrows in winter but never reverses.
The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Valence, A7initial energy charged at home · 0,20 €/kWh | 504 km95 kWh consumed | 0,038 €/km | 18,91 € |
| Valence, A7 → Marseilleenergy charged at Ionity 283 kW · 0,60 €/kWh | 271 km51 kWh consumed | 0,113 €/km | 30,54 € |
| Trip total | 49,45 € | ||
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Limonest, A6initial energy charged at home · 0,20 €/kWh | 436 km85 kWh consumed | 0,039 €/km | 17,00 € |
| Limonest, A6 → Montélimar, A7energy charged at Ionity 133 kW · 0,60 €/kWh | 194 km38 kWh consumed | 0,117 €/km | 22,66 € |
| Montélimar, A7 → Marseilleenergy charged at Ionity 136 kW · 0,60 €/kWh | 145 km28 kWh consumed | 0,117 €/km | 16,90 € |
| Trip total | 56,56 € | ||
How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
| Charging stop duration | Audi S e-tron GT | Audi S6 Sportback e-tron |
|---|---|---|
| 5 minutes | ~99 km | - |
| 10 minutes | ~199 km | - |
| 20 minutes | ~398 km | - |
| Full session 10 → 80 % | ~392 km21 min | - |
Replace one of the two with an alternative from the same segment
670 ch · 105 kWh · 2025
543 ch · 94.4 kWh · 2026
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the S e-tron GT arrives in 7h13 with 1 charging stop.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 49,45 € (S e-tron GT) and 56,56 € (S6 Sportback e-tron). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.