EV6 GT AWD
585 ch · 74 kWh · 2023
Motorway range comparison
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
Paris → Marseille · 130 km/h · Caralogy simulation
| EV6 GT AWD | Cayenne S 958.1 | |
|---|---|---|
| Total time | 8h05 | 7h06−59 min |
| Charging stops | 4 stops | 1 stop−3 stops |
| Total cost | 76,83 €−91,76 € | 168,59 € |
Both vehicles drive at 130 km/h. The difference comes from charging stops.
Analysis
Both vehicles drove at 130 km/h for the entire trip. The Cayenne S 958.1 (combustion) makes 1 stop of 5 min, the EV6 GT AWD (electric) 4 stops totalling 64 min. Road safety reminder: on a trip of this duration, it is recommended to stop for at least 68 min total (17 min every 2h). The energy cost is 76,83 € for EV6 GT AWD versus 168,59 € for Cayenne S 958.1.
The official WLTP figures (17,8 kWh/100km for EV6 GT AWD and 13,1 L/100km for Cayenne S 958.1) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 22,3 kWh/100km (EV6 GT AWD) and 10,7 L/100km (Cayenne S 958.1). Full methodology: see the dedicated button above the summary.
On a 200 km round trip (e.g. a weekend getaway), the electric or plug-in hybrid vehicle completes the entire journey on home energy at 0.18 €/kWh - with no charging stop. The time advantage of the combustion car on long-distance motorways disappears entirely, and the economic advantage of electric strengthens considerably.
The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Tournus, A6initial energy charged at home · 0,20 €/kWh | 299 km67 kWh consumed | 0,045 €/km | 13,33 € |
| Tournus, A6 → Limonest, A6energy charged at Ionity 104 kW · 0,60 €/kWh | 133 km30 kWh consumed | 0,134 €/km | 17,76 € |
| Limonest, A6 → Montélimar, A7energy charged at Ionity 104 kW · 0,60 €/kWh | 133 km30 kWh consumed | 0,134 €/km | 17,76 € |
| Montélimar, A7 → Manosque, A51energy charged at Ionity 104 kW · 0,60 €/kWh | 133 km30 kWh consumed | 0,134 €/km | 17,76 € |
| Manosque, A51 → Marseilleenergy charged at Ionity 109 kW · 0,60 €/kWh | 77 km17 kWh consumed | 0,133 €/km | 10,22 € |
| Trip total | 76,83 € | ||
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Manosque, A51fuel · 2,03 €/L | 713 km76 L consumed | 0,218 €/km | 155,15 € |
| Manosque, A51 → Marseillefuel · 2,03 €/L | 62 km7 L consumed | 0,217 €/km | 13,44 € |
| Trip total | 168,59 € | ||
How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
| Charging stop duration | Kia EV6 GT AWD | Porsche Cayenne S 958.1 |
|---|---|---|
| 5 minutes | - | - |
| 10 minutes | - | - |
| 20 minutes | - | - |
| Full session 10 → 80 % | - | - |
Replace one of the two with an alternative from the same segment
585 ch · 74 kWh · 2023
420 ch · 2012
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the Cayenne S 958.1 arrives in 7h06 with 1 charging stop.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 76,83 € (EV6 GT AWD) and 168,59 € (Cayenne S 958.1). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.