Taycan Turbo J1.1
670 ch · 83.7 kWh · 2023
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
| Measure | Taycan Turbo J1.1 | Explorer ST 400 | Gap |
|---|---|---|---|
| Total time | 7h33 | 7h06 | 27 min · Explorer ST 400 |
| Charging stops | 4 stops | 1 stop | 3 stops · Explorer ST 400 |
| Cost of energy used | 91.61 € | 148.10 € | 56.49 € · Taycan Turbo J1.1 |
Both vehicles drove at 130 km/h for the entire trip. The Explorer ST 400 (combustion) makes 1 stop of 5 min, the Taycan Turbo J1.1 (electric) 4 stops totalling 32 min. Road safety reminder: on a trip of this duration, it is recommended to stop for at least 51 min total (17 min every 2h). The energy cost is 91,61 € for Taycan Turbo J1.1 versus 148,10 € for Explorer ST 400.
The official WLTP figures (22,9 kWh/100km for Taycan Turbo J1.1 and 11,8 L/100km for Explorer ST 400) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 26,2 kWh/100km (Taycan Turbo J1.1) and 9,4 L/100km (Explorer ST 400). Full methodology: see the dedicated button above the summary.
On a 200 km round trip (e.g. a weekend getaway), the electric or plug-in hybrid vehicle completes the entire journey on home energy at 0.18 €/kWh - with no charging stop. The time advantage of the combustion car on long-distance motorways disappears entirely, and the economic advantage of electric strengthens considerably.
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Beaune, A6 | initial energy charged at home · 0.20 €/kWh | 288 km | 75 kWh consumed | 0.052 €/km | 15.07 € |
| Beaune, A6 → Limonest, A6 | energy charged at Ionity 251 kW · 0.60 €/kWh | 128 km | 33 kWh consumed | 0.157 €/km | 20.09 € |
| Limonest, A6 → Valence, A7 | energy charged at Ionity 251 kW · 0.60 €/kWh | 128 km | 33 kWh consumed | 0.157 €/km | 20.09 € |
| Valence, A7 → Manosque, A51 | energy charged at Ionity 251 kW · 0.60 €/kWh | 128 km | 33 kWh consumed | 0.157 €/km | 20.09 € |
| Manosque, A51 → Marseille | energy charged at Ionity 262 kW · 0.60 €/kWh | 104 km | 27 kWh consumed | 0.156 €/km | 16.27 € |
| Trip total | 91.61 € |
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Aix-en-Provence, A7 | fuel · 2.03 €/L | 737 km | 69 L consumed | 0.191 €/km | 140.89 € |
| Aix-en-Provence, A7 → Marseille | fuel · 2.03 €/L | 38 km | 4 L consumed | 0.190 €/km | 7.22 € |
| Trip total | 148.10 € |
| Charging stop duration | Porsche Taycan Turbo J1.1 | Ford Explorer ST 400 |
|---|---|---|
| 5 minutes | ~60 km | - |
| 10 minutes | ~120 km | - |
| 20 minutes | ~241 km | - |
| Full session 10 → 80 % | ~224 km · 23 min | - |
Replace one of the two with an alternative from the same segment
670 ch · 83.7 kWh · 2023
405 ch · 2020
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the Explorer ST 400 arrives in 7h06 with 1 charging stop.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 91,61 € (Taycan Turbo J1.1) and 148,10 € (Explorer ST 400). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.