Model S 85
362 ch · 77.5 kWh · 2012
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
| Measure | Model S 85 | Q7 SUV | Gap |
|---|---|---|---|
| Total time | 8h09 | 7h16 | 53 min · Q7 SUV |
| Charging stops | 4 stops | 3 stops | 1 stop · Q7 SUV |
| Cost of energy used | 86.68 € | 475.82 € | 389.14 € · Model S 85 |
Both vehicles drove at 130 km/h for the entire trip. The Q7 SUV (combustion) makes 3 stops totalling 15 min, the Model S 85 (electric) 4 stops totalling 69 min. Road safety reminder: on a trip of this duration, it is recommended to stop for at least 68 min total (17 min every 2h). The energy cost is 86,68 € for Model S 85 versus 475,82 € for Q7 SUV.
The official WLTP figures (23,5 kWh/100km for Model S 85 and 8,4 L/100km for Q7 SUV) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 24,6 kWh/100km (Model S 85) and 30,2 L/100km (Q7 SUV). Full methodology: see the dedicated button above the summary.
On a 200 km round trip (e.g. a weekend getaway), the electric or plug-in hybrid vehicle completes the entire journey on home energy at 0.18 €/kWh - with no charging stop. The time advantage of the combustion car on long-distance motorways disappears entirely, and the economic advantage of electric strengthens considerably.
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Beaune, A6 | initial energy charged at home · 0.20 €/kWh | 283 km | 70 kWh consumed | 0.049 €/km | 13.96 € |
| Beaune, A6 → Limonest, A6 | energy charged at Supercharger 116 kW · 0.60 €/kWh | 126 km | 31 kWh consumed | 0.148 €/km | 18.60 € |
| Limonest, A6 → Valence, A7 | energy charged at Supercharger 116 kW · 0.60 €/kWh | 126 km | 31 kWh consumed | 0.148 €/km | 18.60 € |
| Valence, A7 → Manosque, A51 | energy charged at Supercharger 116 kW · 0.60 €/kWh | 126 km | 31 kWh consumed | 0.148 €/km | 18.60 € |
| Manosque, A51 → Marseille | energy charged at Supercharger 107 kW · 0.60 €/kWh | 114 km | 28 kWh consumed | 0.148 €/km | 16.93 € |
| Trip total | 86.68 € |
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Beaune, A6 | fuel · 2.03 €/L | 224 km | 68 L consumed | 0.613 €/km | 137.23 € |
| Beaune, A6 → Limonest, A6 | fuel · 2.03 €/L | 224 km | 68 L consumed | 0.613 €/km | 137.23 € |
| Limonest, A6 → Manosque, A51 | fuel · 2.03 €/L | 224 km | 68 L consumed | 0.613 €/km | 137.23 € |
| Manosque, A51 → Marseille | fuel · 2.03 €/L | 104 km | 32 L consumed | 0.617 €/km | 64.14 € |
| Trip total | 475.82 € |
| Charging stop duration | Tesla Model S 85 | Audi Q7 SUV |
|---|---|---|
| 5 minutes | ~28 km | - |
| 10 minutes | ~57 km | - |
| 20 minutes | ~114 km | - |
| Full session 10 → 80 % | ~220 km · 42 min | - |
Replace one of the two with an alternative from the same segment
362 ch · 77.5 kWh · 2012
231 ch · 2026
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the Q7 SUV arrives in 7h16 with 3 charging stops.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 86,68 € (Model S 85) and 475,82 € (Q7 SUV). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.