I-PACE EV400
400 ch · 84.7 kWh · 2019
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
| Measure | I-PACE EV400 | iX3 G08 | Gap |
|---|---|---|---|
| Total time | 7h54 | 8h13 | 19 min · I-PACE EV400 |
| Charging stops | 3 stops | 4 stops | 1 stop · I-PACE EV400 |
| Cost of energy used | 74.14 € | 83.80 € | 9.66 € · I-PACE EV400 |
Both vehicles drove at 130 km/h for the entire trip. The gap is built at the stops: 3 stops totalling 53 min for the I-PACE EV400 versus 4 stops totalling 72 min for the iX3 G08.
The official WLTP figures (18,0 kWh/100km for I-PACE EV400 and 19,0 kWh/100km for iX3 G08) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 22,5 kWh/100km (I-PACE EV400) and 23,7 kWh/100km (iX3 G08). Full methodology: see the dedicated button above the summary.
During the 53 minutes of charging for the I-PACE EV400, range recovers by 466 km. During the 72 cumulative minutes for the iX3 G08, range recovers by 526 km. Per minute: the I-PACE EV400 recovers 1,2× faster. The gap is less pronounced but accumulates over long distances.
A Peugeot 3008 1.2 PureTech 130 (equivalent segment) consumes about 7,8 L/100km on the motorway at 130 km/h. At 1,9 €/L, this Paris → Marseille trip would cost ~112 €. That is 1,5× the electric cost of the I-PACE EV400 and 1,3× that of the iX3 G08. The gap narrows in winter but never reverses.
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Tournus, A6 | initial energy charged at home · 0.20 €/kWh | 339 km | 76 kWh consumed | 0.045 €/km | 15.25 € |
| Tournus, A6 → Valence, A7 | energy charged at Ionity 120 kW · 0.60 €/kWh | 151 km | 34 kWh consumed | 0.135 €/km | 20.33 € |
| Valence, A7 → Montélimar, A7 | energy charged at Ionity 120 kW · 0.60 €/kWh | 151 km | 34 kWh consumed | 0.135 €/km | 20.33 € |
| Montélimar, A7 → Marseille | energy charged at Ionity 117 kW · 0.60 €/kWh | 135 km | 30 kWh consumed | 0.135 €/km | 18.23 € |
| Trip total | 74.14 € |
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Beaune, A6 | initial energy charged at home · 0.20 €/kWh | 280 km | 67 kWh consumed | 0.048 €/km | 13.33 € |
| Beaune, A6 → Limonest, A6 | energy charged at Ionity 104 kW · 0.60 €/kWh | 125 km | 30 kWh consumed | 0.142 €/km | 17.76 € |
| Limonest, A6 → Valence, A7 | energy charged at Ionity 104 kW · 0.60 €/kWh | 125 km | 30 kWh consumed | 0.142 €/km | 17.76 € |
| Valence, A7 → Manosque, A51 | energy charged at Ionity 104 kW · 0.60 €/kWh | 125 km | 30 kWh consumed | 0.142 €/km | 17.76 € |
| Manosque, A51 → Marseille | energy charged at Ionity 98 kW · 0.60 €/kWh | 121 km | 29 kWh consumed | 0.142 €/km | 17.20 € |
| Trip total | 83.80 € |
| Charging stop duration | Jaguar I-PACE EV400 | BMW iX3 G08 |
|---|---|---|
| 5 minutes | - | - |
| 10 minutes | - | - |
| 20 minutes | - | - |
| Full session 10 → 80 % | - | - |
Replace one of the two with an alternative from the same segment
400 ch · 84.7 kWh · 2019
286 ch · 74 kWh · 2020
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the I-PACE EV400 arrives in 7h54 with 3 charging stops.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 74,14 € (I-PACE EV400) and 83,80 € (iX3 G08). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.