G 580 W463
587 ch · 116 kWh · 2024
Motorway range comparison
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
Paris → Marseille · 130 km/h · Caralogy simulation
| G 580 W463 | S8 | |
|---|---|---|
| Total time | 7h46 | 7h06−40 min |
| Charging stops | 3 stops | 1 stop−2 stops |
| Total cost | 100,66 €−113,18 € | 213,84 € |
Both vehicles drive at 130 km/h. The difference comes from charging stops.
Analysis
Both vehicles drove at 130 km/h for the entire trip. The S8 (combustion) makes 1 stop of 5 min, the G 580 W463 (electric) 3 stops totalling 45 min. Road safety reminder: on a trip of this duration, it is recommended to stop for at least 51 min total (17 min every 2h). The energy cost is 100,66 € for G 580 W463 versus 213,84 € for S8.
The official WLTP figures (24,5 kWh/100km for G 580 W463 and 11,7 L/100km for S8) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 30,6 kWh/100km (G 580 W463) and 13,6 L/100km (S8). Full methodology: see the dedicated button above the summary.
On a 200 km round trip (e.g. a weekend getaway), the electric or plug-in hybrid vehicle completes the entire journey on home energy at 0.18 €/kWh - with no charging stop. The time advantage of the combustion car on long-distance motorways disappears entirely, and the economic advantage of electric strengthens considerably.
The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Tournus, A6initial energy charged at home · 0,20 €/kWh | 341 km104 kWh consumed | 0,061 €/km | 20,89 € |
| Tournus, A6 → Valence, A7energy charged at Ionity 186 kW · 0,60 €/kWh | 152 km46 kWh consumed | 0,183 €/km | 27,84 € |
| Valence, A7 → Montélimar, A7energy charged at Ionity 186 kW · 0,60 €/kWh | 152 km46 kWh consumed | 0,183 €/km | 27,84 € |
| Montélimar, A7 → Marseilleenergy charged at Ionity 185 kW · 0,60 €/kWh | 131 km40 kWh consumed | 0,184 €/km | 24,09 € |
| Trip total | 100,66 € | ||
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Valence, A7fuel · 2,03 €/L | 544 km74 L consumed | 0,276 €/km | 150,04 € |
| Valence, A7 → Marseillefuel · 2,03 €/L | 231 km31 L consumed | 0,276 €/km | 63,80 € |
| Trip total | 213,84 € | ||
How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
| Charging stop duration | Mercedes G 580 W463 | Audi S8 |
|---|---|---|
| 5 minutes | ~38 km | - |
| 10 minutes | ~76 km | - |
| 20 minutes | ~152 km | - |
| Full session 10 → 80 % | ~265 km37 min | - |
Replace one of the two with an alternative from the same segment
587 ch · 116 kWh · 2024
571 ch · 2025
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the S8 arrives in 7h06 with 1 charging stop.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 100,66 € (G 580 W463) and 213,84 € (S8). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.