I-PACE EV400
400 ch · 84.7 kWh · 2019
Motorway range comparison
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
Paris → Marseille · 130 km/h · Caralogy simulation
| I-PACE EV400 | iX1 xDrive30 I20 | |
|---|---|---|
| Total time | 7h54−6 min | 8h |
| Charging stops | 3 stops−2 stops | 5 stops |
| Total cost | 74,14 €−5,33 € | 79,47 € |
Both vehicles drive at 130 km/h. The difference comes from charging stops.
Analysis
Both vehicles drove at 130 km/h for the entire trip. The gap is built at the stops: 3 stops totalling 53 min for the I-PACE EV400 versus 5 stops totalling 59 min for the iX1 xDrive30 I20.
The official WLTP figures (18,0 kWh/100km for I-PACE EV400 and 17,4 kWh/100km for iX1 xDrive30 I20) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 22,5 kWh/100km (I-PACE EV400) and 21,8 kWh/100km (iX1 xDrive30 I20). Full methodology: see the dedicated button above the summary.
During the 53 minutes of charging for the I-PACE EV400, range recovers by 466 km. During the 59 cumulative minutes for the iX1 xDrive30 I20, range recovers by 555 km. Per minute: the I-PACE EV400 recovers 0,9× faster. The gap is less pronounced but accumulates over long distances.
A Peugeot 3008 1.2 PureTech 130 (equivalent segment) consumes about 7,8 L/100km on the motorway at 130 km/h. At 1,9 €/L, this Paris → Marseille trip would cost ~112 €. That is 1,5× the electric cost of the I-PACE EV400 and 1,4× that of the iX1 xDrive30 I20. The gap narrows in winter but never reverses.
The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Tournus, A6initial energy charged at home · 0,20 €/kWh | 339 km76 kWh consumed | 0,045 €/km | 15,25 € |
| Tournus, A6 → Valence, A7energy charged at Ionity 120 kW · 0,60 €/kWh | 151 km34 kWh consumed | 0,135 €/km | 20,33 € |
| Valence, A7 → Montélimar, A7energy charged at Ionity 120 kW · 0,60 €/kWh | 151 km34 kWh consumed | 0,135 €/km | 20,33 € |
| Montélimar, A7 → Marseilleenergy charged at Ionity 117 kW · 0,60 €/kWh | 135 km30 kWh consumed | 0,135 €/km | 18,23 € |
| Trip total | 74,14 € | ||
| Segment | Distance | €/km | Cost |
|---|---|---|---|
| Paris → Beaune, A6initial energy charged at home · 0,20 €/kWh | 249 km54 kWh consumed | 0,044 €/km | 10,84 € |
| Beaune, A6 → Tournus, A6energy charged at Ionity 120 kW · 0,60 €/kWh | 111 km24 kWh consumed | 0,130 €/km | 14,45 € |
| Tournus, A6 → Valence, A7energy charged at Ionity 120 kW · 0,60 €/kWh | 111 km24 kWh consumed | 0,130 €/km | 14,45 € |
| Valence, A7 → Montélimar, A7energy charged at Ionity 120 kW · 0,60 €/kWh | 111 km24 kWh consumed | 0,130 €/km | 14,45 € |
| Montélimar, A7 → Manosque, A51energy charged at Ionity 120 kW · 0,60 €/kWh | 111 km24 kWh consumed | 0,130 €/km | 14,45 € |
| Manosque, A51 → Marseilleenergy charged at Ionity 123 kW · 0,60 €/kWh | 83 km18 kWh consumed | 0,131 €/km | 10,84 € |
| Trip total | 79,47 € | ||
How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
| Charging stop duration | Jaguar I-PACE EV400 | BMW iX1 xDrive30 I20 |
|---|---|---|
| 5 minutes | - | ~35 km |
| 10 minutes | - | ~70 km |
| 20 minutes | - | ~139 km |
| Full session 10 → 80 % | - | ~194 km30 min |
Replace one of the two with an alternative from the same segment
400 ch · 84.7 kWh · 2019
313 ch · 60.2 kWh · 2022
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the I-PACE EV400 arrives in 7h54 with 3 charging stops.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 74,14 € (I-PACE EV400) and 79,47 € (iX1 xDrive30 I20). An equivalent petrol SUV (~8 L/100 km) would cost about 115 € in motorway fuel. Electric costs less in energy but adds charging stops.