Mustang Mach-E GT
487 ch · 88 kWh · 2021
Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.
| Measure | Mustang Mach-E GT | Dolphin Boost 150kW | Gap |
|---|---|---|---|
| Total time | 8h03 | 7h55 | 8 min · Dolphin Boost 150kW |
| Charging stops | 4 stops | 3 stops | 1 stop · Dolphin Boost 150kW |
| Cost of energy used | 89.23 € | 51.95 € | 37.28 € · Dolphin Boost 150kW |
Both vehicles drove at 130 km/h for the entire trip. The gap is built at the stops: 3 stops totalling 54 min for the Dolphin Boost 150kW versus 4 stops totalling 62 min for the Mustang Mach-E GT.
The official WLTP figures (20,8 kWh/100km for Mustang Mach-E GT and 14,5 kWh/100km for Dolphin Boost 150kW) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 26,0 kWh/100km (Mustang Mach-E GT) and 15,7 kWh/100km (Dolphin Boost 150kW). Full methodology: see the assumptions below the controls.
During the 54 minutes of charging for the Dolphin Boost 150kW, range recovers by 470 km. During the 62 cumulative minutes for the Mustang Mach-E GT, range recovers by 500 km. Per minute: the Dolphin Boost 150kW recovers 1,1× faster. The gap is less pronounced but accumulates over long distances.
A Peugeot 3008 1.2 PureTech 130 (equivalent segment) consumes about 7,8 L/100km on the motorway at 130 km/h. At 1,9 €/L, this Paris → Marseille trip would cost ~112 €. That is 1,3× the electric cost of the Mustang Mach-E GT and 2,2× that of the Dolphin Boost 150kW. The gap narrows in winter but never reverses.
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Tournus, A6 | initial energy charged at home · 0.20 €/kWh | 305 km | 79 kWh consumed | 0.052 €/km | 15.85 € |
| Tournus, A6 → Limonest, A6 | energy charged at Ionity 124 kW · 0.60 €/kWh | 135 km | 35 kWh consumed | 0.156 €/km | 21.12 € |
| Limonest, A6 → Montélimar, A7 | energy charged at Ionity 124 kW · 0.60 €/kWh | 135 km | 35 kWh consumed | 0.156 €/km | 21.12 € |
| Montélimar, A7 → Manosque, A51 | energy charged at Ionity 124 kW · 0.60 €/kWh | 135 km | 35 kWh consumed | 0.156 €/km | 21.12 € |
| Manosque, A51 → Marseille | energy charged at Ionity 123 kW · 0.60 €/kWh | 64 km | 17 kWh consumed | 0.157 €/km | 10.02 € |
| Trip total | 89.23 € |
| Segment | Energy used | Distance | Consumption | €/km | Cost (€) |
|---|---|---|---|---|---|
| Paris → Tournus, A6 | initial energy charged at home · 0.20 €/kWh | 335 km | 53 kWh consumed | 0.031 €/km | 10.54 € |
| Tournus, A6 → Valence, A7 | energy charged at Ionity 83 kW · 0.60 €/kWh | 149 km | 23 kWh consumed | 0.094 €/km | 14.04 € |
| Valence, A7 → Montélimar, A7 | energy charged at Ionity 83 kW · 0.60 €/kWh | 149 km | 23 kWh consumed | 0.094 €/km | 14.04 € |
| Montélimar, A7 → Marseille | energy charged at Ionity 81 kW · 0.60 €/kWh | 142 km | 22 kWh consumed | 0.094 €/km | 13.34 € |
| Trip total | 51.95 € |
| Charging stop duration | Ford Mustang Mach-E GT | BYD Dolphin Boost 150kW |
|---|---|---|
| 5 minutes | - | - |
| 10 minutes | - | - |
| 20 minutes | - | - |
| Full session 10 → 80 % | - | - |
Replace one of the two with an alternative from the same segment
487 ch · 88 kWh · 2021
204 ch · 58.5 kWh · 2022
The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the Dolphin Boost 150kW arrives in 7h55 with 3 charging stops.
WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.
Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.
No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.
Electric: 89,23 € (Mustang Mach-E GT) and 51,95 € (Dolphin Boost 150kW). An equivalent Peugeot 3008 1.2 PureTech 130 (~7,8 L/100 km) would cost about 112 € in motorway fuel. Electric costs less in energy but adds charging stops.