Skip to main content
CaralogyCaralogy
HomeBrandsRoad TripBudgetDuelGuides
Caralogy

The car comparison platform. Physics simulation, road trips, real costs.

Navigation
All brandsCar duelRunning costsMotorwayMethodology
Simulators
Motorway simulatorRunning costsPerformance duel
Brands
VolkswagenBMWMercedesToyotaTeslaAudi
FRENDEESIT
© 2026 Caralogy · All rights reserved
  1. Home
  2. /Motorway
  3. /city car
Ai3vsB5BEV
  • MotorwayMotorwayRange and charging
  • PerformancePerformance0-100, top speed
  • ConsumptionConsumptionYearly cost
  • Specsi3 · 5

BMW i3 I01 vs Renault 5 E-Tech Electric 150

Trip mapped at a glance. Charging stops visible, total duration predictable. Caralogy simulation at 130 km/h.

city car · 2018 vs 2024 · Paris → Marseille · 775 km · 130 km/h
BMWBEV

i3 I01

170 ch · 37.9 kWh · 2018

VS
RenaultBEVPlus rapide

5 E-Tech Electric 150

150 ch · 47 kWh · 2024

Simulation trip
Assumptions: 130 km/h · start 100 % · mild weather

Result · total trip time

ABMW i3 I01

8h41charging included

6 stops · 58.24 €

Gap36 minin favour of 5 E-Tech Electric 150
BRenault 5 E-Tech Electric 150

8h05charging included

5 stops · 64.84 €

Paris → Marseille · 130 km/h · Caralogy simulation
Measurei3 I015 E-Tech Electric 150Gap
Total time8h418h0536 min · 5 E-Tech Electric 150
Charging stops6 stops5 stops1 stop · 5 E-Tech Electric 150
Cost of energy used58.24 €64.84 €6.60 € · i3 I01

Visualise the trip

Both vehicles drive at 130 km/h. The difference comes from charging stops.

BMWBEV
i3 I01
100%
245 km
Range
Paris
0 km · departure
Charge 1
17 min · +15 kWh · 9.10 €
Charge 2
17 min · +15 kWh · 9.10 €
Charge 3
17 min · +15 kWh · 9.10 €
Charge 4
17 min · +15 kWh · 9.10 €
Charge 5
17 min · +15 kWh · 9.10 €
Charge 6
16 min · +15 kWh · 8.72 €
Marseille
775 km · Arrival 8h41
6
Stops
8h41
Duration
58.24 €
Cost of energy used
RenaultBEVFastest
5 E-Tech Electric 150
100%
267 km
Range
Paris
0 km · departure
Charge 1
12 min · +19 kWh · 11.28 €
Charge 2
12 min · +19 kWh · 11.28 €
Charge 3
12 min · +19 kWh · 11.28 €
Charge 4
12 min · +19 kWh · 11.28 €
Charge 5
16 min · +24 kWh · 14.42 €
Marseille
775 km · Arrival 8h05
5
Stops
8h05
Duration
64.84 €
Cost of energy used

The 36-minute lead of the 5 E-Tech Electric 150 does not come from driving speed, but from one fewer charging stop on this route (5 vs 6).

Both vehicles drove at 130 km/h for the entire trip. The gap is built at the stops: 5 stops totalling 64 min for the 5 E-Tech Electric 150 versus 6 stops totalling 100 min for the i3 I01.

Motorway consumption: the Caralogy methodology

The official WLTP figures (13,1 kWh/100km for i3 I01 and 14,9 kWh/100km for 5 E-Tech Electric 150) are measured on a mixed cycle averaging ~46 km/h. At a steady 130 km/h, aerodynamic drag weighs much more heavily - it grows with the square of speed. Caralogy calculates a motorway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve - not a uniform correction factor. For this trip, the simulation yields 15,5 kWh/100km (i3 I01) and 17,6 kWh/100km (5 E-Tech Electric 150). Full methodology: see the assumptions below the controls.

Recovery speed: 8,8 km/min versus 5,8 km/min

During the 64 minutes of charging for the 5 E-Tech Electric 150, range recovers by 564 km. During the 100 cumulative minutes for the i3 I01, range recovers by 583 km. Per minute: the 5 E-Tech Electric 150 recovers 1,5× faster. At this rate, the charging stop blends into the trip rhythm - just enough time for a coffee. At a lower rate, it dictates the pace.

For reference: how much would an equivalent petrol car cost?

A Peugeot 208 1.2 PureTech 100 (equivalent segment) consumes about 6,2 L/100km on the motorway at 130 km/h. At 1,9 €/L, this Paris → Marseille trip would cost ~89 €. That is 1,5× the electric cost of the i3 I01 and 1,4× that of the 5 E-Tech Electric 150. The gap narrows in winter but never reverses.

Energy cost breakdown for your trip Paris → Marseille

The cost per kilometre depends on the electricity rate applied to each segment - based on the energy source used at that point of the trip.

BMW i3 I01

SegmentEnergy usedDistanceConsumption€/kmCost (€)
Paris → Beaune, A6initial energy charged at home · 0.20 €/kWh221 km34 kWh consumed0.031 €/km6.83 €
Beaune, A6 → Tournus, A6energy charged at Ionity 54 kW · 0.60 €/kWh98 km15 kWh consumed0.093 €/km9.10 €
Tournus, A6 → Limonest, A6energy charged at Ionity 54 kW · 0.60 €/kWh98 km15 kWh consumed0.093 €/km9.10 €
Limonest, A6 → Valence, A7energy charged at Ionity 54 kW · 0.60 €/kWh98 km15 kWh consumed0.093 €/km9.10 €
Valence, A7 → Montélimar, A7energy charged at Ionity 54 kW · 0.60 €/kWh98 km15 kWh consumed0.093 €/km9.10 €
Montélimar, A7 → Manosque, A51energy charged at Ionity 54 kW · 0.60 €/kWh98 km15 kWh consumed0.093 €/km9.10 €
Manosque, A51 → Marseilleenergy charged at Ionity 54 kW · 0.60 €/kWh64 km10 kWh consumed0.093 €/km5.93 €
Trip total58.24 €

Renault 5 E-Tech Electric 150

SegmentEnergy usedDistanceConsumption€/kmCost (€)
Paris → Beaune, A6initial energy charged at home · 0.20 €/kWh241 km42 kWh consumed0.035 €/km8.46 €
Beaune, A6 → Tournus, A6energy charged at Ionity 94 kW · 0.60 €/kWh107 km19 kWh consumed0.105 €/km11.28 €
Tournus, A6 → Limonest, A6energy charged at Ionity 94 kW · 0.60 €/kWh107 km19 kWh consumed0.105 €/km11.28 €
Limonest, A6 → Montélimar, A7energy charged at Ionity 94 kW · 0.60 €/kWh107 km19 kWh consumed0.105 €/km11.28 €
Montélimar, A7 → Manosque, A51energy charged at Ionity 94 kW · 0.60 €/kWh107 km19 kWh consumed0.105 €/km11.28 €
Manosque, A51 → Marseilleenergy charged at Ionity 90 kW · 0.60 €/kWh107 km19 kWh consumed0.105 €/km11.26 €
Trip total64.84 €

Range recovered by stop duration

How many kilometres do you recover depending on the time spent at the charger? Comparison at nominal peak power.
Charging stop durationBMW i3 I01Renault 5 E-Tech Electric 150
5 minutes-~33 km
10 minutes-~66 km
20 minutes-~133 km
Full session 10 → 80 %-~187 km · 30 min

What produces these figures

WLTP combined consumption
13.1 kWh/100 km · 14.9 kWh/100 km
Net battery
37.9 kWh · 47 kWh

Compare with another vehicle

Replace one of the two with an alternative from the same segment

BMWBEV

i3 I01

170 ch · 37.9 kWh · 2018

RenaultBEV

5 E-Tech Electric 150

150 ch · 47 kWh · 2024

Other duels you might be interested in

MINIVSBMW

Cooper E FWD vs i3

PeugeotVSRenault

e-208 156 Phase 2 vs 5 E-Tech Electric 150

MINIVSBMW

Cooper SE FWD vs i3

RenaultVSPeugeot

5 E-Tech Electric 150 vs e-208 136 Phase 2

Frequently asked questions

The advantage comes from the combo real range + charging speed. On Paris → Marseille (775 km at 130 km/h), the 5 E-Tech Electric 150 arrives in 8h05 with 5 charging stops.

WLTP consumption does not reflect motorway reality. Aerodynamic drag grows with the square of speed, so real consumption is 15 to 25 % higher than WLTP combined. Caralogy calculates a highway consumption specific to each vehicle based on its aerodynamic profile (SCx), weight and power curve.

Total time = driving time + charging time. Driving time is calculated at an average speed of 130 km/h on the motorway (adjustable). Charging time is calculated based on the real power curve of each vehicle, respecting the optimal 10 → 80 % range and the maximum power accepted by the chargers on the route.

No. The displayed cost covers only the energy consumed during the trip: kWh × energy rate, with a mix of home charging and DC fast chargers. Battery wear is a long-term ownership cost, not a trip cost.

On this trip, the energy used costs 58.24 € (i3 I01) and 64.84 € (5 E-Tech Electric 150). For reference, an equivalent Peugeot 208 1.2 PureTech 100 (~6.2 L/100 km) would cost about 89 € in fuel.